Title: ERE DC reviews: trustworthy? Score 3.8/10 | EREVergelijken
Canonical: https://erevergelijken.eu/en/providers/ere-dc/
Language: en
Last modified: 2026-10-21
Source: EREVergelijken.eu (the ERE Team), CC BY 4.0 for the data

# ERE DC

ERE provider

What do you keep with ERE DC?

Charged at home per year

4,000kWh

Net per year, indicative

-   ERE DC Every six months (from 2027) € 410 to 510

-   ≈ Median, open offers All providers open now € 490

At 4,000 kWh about € 30 below the median.

[Compare all providers](https://erevergelijken.eu/en/compare/?kwh=4000)

via Duurzame Cijfers Private Business

With ERE DC you have the kWh you charge at home registered with the NEa and receive your share of the ERE proceeds (registration runs through Duurzame Cijfers). Rate 25%, payout every six months (from 2027), contract 12 months. Sign-up is open to private and business customers.

[Compare with other providers →](https://erevergelijken.eu/en/compare/) [Go to ere-dc.nl ↗](https://ere-dc.nl/?utm_source=erevergelijken&utm_medium=referral&utm_campaign=vergelijking&utm_content=provider_hero)

Last updated: October 21, 2026 at 06:02 [Share your experience](https://erevergelijken.eu/en/providers/ere-dc/#ervaringen)

3.8

Trust score

Limited · 3.8/10

18 checks of public terms

-   Hidden fees 3.3
-   Clear terms 2.0
-   Payout & exit 4.0
-   Strong backing 5.5

Hidden fees

Cannot be checked: price or terms not public

Unknown

[See every check ↓](https://erevergelijken.eu/en/providers/ere-dc/#vertrouwensscore)

Short answer

As of September 27, 2026, the rate at ERE DC is 25%, payout is every six months (from 2027), the contract is 12 months and the trust score is 3.8/10. ERE DC has the kWh you charge at home registered with the NEa and pays out your share of the ERE proceeds (registration runs through Duurzame Cijfers).

Net per year\*

€ 410 to 510

Rate

25%

Payout

Every six months (from 2027)

Contract term

12 months

Hidden fees

Unknown

\* Indication at 4,000 kWh per year, based on public rates and the current ERE price. [Adjust calculation →](https://erevergelijken.eu/en/earnings-calculator/)

## ERE DC in short

### Strengths

-   Lower commission for longer terms (down to 15%)
-   Lower commission for business (20%, 15% or 10%)

### Points of attention

-   General terms are consultancy terms without ERE provisions
-   Terms allow rate changes without consent
-   Contracting party ERE-DC B.V. is not itself on the NEa list

## Terms

Rate

25% Private 25% (1 calendar year), 20% (3 years), 15% (5 years); business 20%, 15% or 10%. VAT not stated

Payout

Every six months (from 2027) One payout in 2026; every six months from 2027. No date or deadline is given.

Contract term

12 months

Notice period

The 1-year option is called ‘cancellable yearly’, without a notice period; the terms (art. N) mention immediate cancellation against payment for work done.

Extra costs

Site: ‘no hidden costs’. The general terms (consultancy terms) mention travel costs and an hourly rate for extra work; unclear whether that applies to the ERE service.

Processed via

Duurzame Cijfers

For

Private · Business

[Switching on 1 January 2027: Not a single rule. The general terms allow either party to cancel immediately in writing. The homepage does not give a date.](https://erevergelijken.eu/en/switching-ere-provider/#ere-dc)

Trust score

## How trustworthy is ERE DC?

We checked 18 points in the public terms, prices and company details. Every point has a source; anything not made public earns no points.

Checked on October 6, 2026 · [How we calculate the score →](https://erevergelijken.eu/en/how-we-compare/#vertrouwensscore)

Hidden fees 1/3 passed · weight 30% 3.3

-   ✓

    Headline price is published before sign-up: Yes

    The calculator on the homepage shows the commission per customer type and term (private 25%, 20% or 15%). [source ↗](https://ere-dc.nl/)

-   ?

    No extra costs on top of the headline price: Not public

    The site says ‘no hidden costs’; the general terms (art. I) mention travel costs and an hourly rate for extra work. Unclear whether that applies to the ERE service. [source ↗](https://ere-dc.nl/algemenevoorwaarden)

-   ?

    Any extra costs are shown next to the price: Not public

    Cannot be assessed while it is unclear whether the cost items in the terms apply to the ERE service. [source ↗](https://ere-dc.nl/)

Clear terms 1/5 passed · weight 20% 2.0

-   ✕

    Full terms are public, no account needed: No

    The public general terms are generic consultancy terms; ERE provisions on commission, term and payout are missing. [source ↗](https://ere-dc.nl/algemenevoorwaarden)

-   ✕

    Term and notice period are clearly stated: No

    Terms: open-ended and cancellable at any time (art. C and N); the site mentions 1, 3 or 5 calendar years. No notice period for the ERE service. [source ↗](https://ere-dc.nl/algemenevoorwaarden)

-   ✕

    No one-sided price changes without a right to cancel: No

    Art. I.4: the rate may be changed without consent if wages or prices change. [source ↗](https://ere-dc.nl/algemenevoorwaarden)

-   ?

    No tacit renewal into a new fixed term: Not public

    Not stated whether the 1-, 3- or 5-year term renews tacitly. [source ↗](https://ere-dc.nl/register)

-   ✓

    Public privacy policy: Yes

    Public privacy statement of ERE-DC B.V. covering account data, IBAN and documents on the platform. [source ↗](https://ere-dc.nl/privacy)

Payout & exit 2/5 passed · weight 25% 4.0

-   ✕

    A concrete payout moment is stated: No

    Only ‘once in 2026’ and ‘every six months from 2027’; no date or deadline. [source ↗](https://ere-dc.nl/)

-   ✓

    Paid automatically, no claim or threshold: Yes

    The bank account is requested at registration; no claim or minimum amount found. [source ↗](https://ere-dc.nl/register)

-   ✓

    No holdback or reserve on payouts: Yes

    No reserve or withholding clause found. [source ↗](https://ere-dc.nl/algemenevoorwaarden)

-   ?

    Cancel without a fee, at most one month’s notice: Not public

    The 1-year option is called ‘cancellable yearly’, without a notice period; the terms (art. N) mention immediate cancellation against payment for work done. [source ↗](https://ere-dc.nl/)

-   ?

    EREs already earned are still paid after leaving: Not public

    Not stated what happens to EREs already built up after termination. [source ↗](https://ere-dc.nl/algemenevoorwaarden)

Strong backing 3/5 passed · weight 25% 5.5

-   ✓

    Legal entity and KvK number on the website: Yes

    Privacy statement: ERE-DC B.V., KvK 42063872. [source ↗](https://ere-dc.nl/privacy)

-   ✓

    Address and direct contact (phone or email) published: Yes

    Van Heemstraweg 123, Druten and contact@ere-dc.nl; no phone number on ere-dc.nl (there is one on duurzamecijfers.nl). [source ↗](https://ere-dc.nl/privacy)

-   ~

    Itself on the NEa list of registration providers: Via partner

    ERE-DC B.V. is not itself on the NEa list (7 August 2026); the site presents the service as Duurzame Cijfers (DC), and Duurzame Cijfers B.V. is listed. [source ↗](https://www.emissieautoriteit.nl/documenten/2026/02/02/lijst-van-inboekdienstverleners)

-   ✕

    Every link (or registered parent) active since 2023 or earlier: No

    The customer contracts with ERE-DC B.V. (KvK 42063872), registered on 20 May 2026. The NEa list names Duurzame Cijfers B.V. (KvK 99199289, registered on 17 December 2025), with no published ownership link. Both are too young, so the age check becomes no. [source ↗](https://www.northdata.com/ERE-DC%20B%C2%B7V%C2%B7,%20Druten/KVK%2042063872)

-   ✕

    Every link is part of a larger group or has documented funding: No

    No parent, group or investor is published for ERE-DC B.V. or Duurzame Cijfers B.V. The backing check stays no. [source ↗](https://www.northdata.com/ERE-DC%20B%C2%B7V%C2%B7,%20Druten/KVK%2042063872)

### Company details

Company

ERE-DC B.V.

KvK number

42063872

Active since

2026

Via

Duurzame Cijfers B.V.

Background

The customer contracts with ERE-DC B.V. (KvK 42063872, registered on 20 May 2026). The NEa list names Duurzame Cijfers B.V. (KvK 99199289, registered on 17 December 2025). No published ownership link, group or investors.

[Something wrong? Let us know and we will re-check it.](https://erevergelijken.eu/en/contact/)

Show this score on your own site?

![Trust score 3.8/10 on EREVergelijken.eu](https://erevergelijken.eu/badge/en/ere-dc.svg)

-   The badge always shows the current score.
-   Using it is free and changes nothing in the comparison.

Paste this code on your site.

```
<a href="https://erevergelijken.eu/en/providers/ere-dc/?utm_source=badge&utm_medium=referral&utm_campaign=vertrouwensscore" rel="noopener"><img src="https://erevergelijken.eu/badge/en/ere-dc.svg" alt="Trust score 3.8/10 on EREVergelijken.eu" width="240" height="80"></a>
```

Price history

## What changed at ERE DC

We record every check of our data, since September 27, 2026. Latest check: October 21, 2026. Corrections of our own mistakes do not count as changes.

Commission

25%

unchanged

Contract term

12 months

unchanged

Sign-up

Open

unchanged

Trust score

3.8/10

unchanged

No changes seen since September 27, 2026. When a price, term or score changes, this shows when, and from what to what.

[All trends: electricity price, charging and ERE](https://erevergelijken.eu/en/trends/)

## Changes at ERE DC

We check every provider’s terms monthly. This is what changed, and what we corrected, with sources.

1.  October 6, 2026 Methodology

    Age becomes no: ERE-DC B.V. registered on 20 May 2026, Duurzame Cijfers B.V. on 17 December 2025 (was: unknown). [Source ↗](https://www.northdata.com/ERE-DC%20B%C2%B7V%C2%B7,%20Druten/KVK%2042063872)

2.  September 27, 2026 Added

    Added to the comparison. [Source ↗](https://ere-dc.nl/)

[All changes at all providers →](https://erevergelijken.eu/en/changes/)

Experiences

## Experiences with ERE DC

Real customer experiences. We read every experience before it appears, and we publish critical ones too. Providers cannot pay to have experiences removed. Experiences do not count towards the trust score.

No experiences yet. Are you or were you a customer of ERE DC? Be the first to share yours and help others choose.

### Share your experience

Keep it factual and personal: how did sign-up, connecting and payout go? No personal data, no advertising.

Your rating

Title

Your experience

Name (optional, shown)

Email (for verification only, never shown)

I am or was a customer and agree to my experience being published after moderation.

Questions

## Frequently asked questions

Is ERE DC reliable?

As of September 27, 2026, the rate at ERE DC is 25%, payout is every six months (from 2027), the contract is 12 months and the trust score is 3.8/10. ERE DC has the kWh you charge at home registered with the NEa and pays out your share of the ERE proceeds (registration runs through Duurzame Cijfers).

What does the earnings indication on this page mean?

The indication is calculated using a fixed reference volume, the working market price and this provider’s commission. It is a range for orientation, not a guaranteed amount.

Is an NEa listing a quality mark?

No. An NEa registration is a requirement to register EREs, but says nothing about the provider’s commission, service or conditions. Assess those points separately.

How do I switch to another provider?

A contract typically runs per calendar year and you are registered with one provider at a time. Switching is usually possible per new calendar year; check the notice period with your current provider.

What is the contract term with this provider?

The contract term is shown on this page; for most providers it is 12 months. Where a provider does not disclose this, we show “Unknown”.

Is this provider shown here because they paid?

No, providers don’t pay for placement. The provider appears in the comparison based on public data, just like all the others.

Where does the data on this page come from?

The data comes from public sources and carries a check date. Missing or undisclosed values are shown as “Unknown”.

Is something on this page incorrect?

Report it to us with the provider and what is incorrect, preferably with a source. We check it and, if needed, update it with a new check date.
