Skip to main content

Transparency

Changes at ERE providers

Every month we automatically check the terms, prices and privacy policies of every provider. When something changes, or when we correct a data point ourselves, it appears here with a date and source.

141 changes at 44 providers

  • Terms changed 30
  • Our correction 75
  • Methodology 12
  • Status 4
  • Added 20

October 2026

  • EarnergyOur correction

    Correction: we had looked at an older sign-up form at earnergy.nl/aanmelden. Sign-up at aanmelden.earnergy.nl asks for the IBAN (step 4). The check ‘Paid automatically, no claim or threshold’ becomes Yes; the trust score goes from 7.5 to 8.0. Source

  • Groen-laden.nlTerms changed

    New agreements: 15% of gross ERE proceeds, at least €34.99 and at most €79.99 per charger per calendar year, incl. VAT (was: a fixed fee of €79.99 a year). No fixed fee per kWh. The homepage says the charger is read automatically. Source

  • EreDirectStatus

    Sign-up is open (EreDirect calls it pre-registration); at 200 sign-ups EreDirect applies for its own NEa account. Same label as other providers in this situation: ‘Sign-up open · registration from 200 participants’. Score unchanged. Source

  • LaadCashStatus

    Sign-up is open and terms version 1.1 (since 6 October 2026) are public; LaadCash registers with the NEa once it has 200 participants and its own REV account is open. The label becomes ‘Sign-up open · registration from 200 participants’ instead of ‘Pre-registration’. Score unchanged (8.0). Source

  • LekkerladenMethodology

    Commission at the reference volume (4,000 kWh) now uses the published volume tier: 22% instead of the standard rate of 25%. Source

  • Frank EnergieTerms changed

    Joulo: no passed-on brand fee anymore (was: allowed). Immediate termination at the latest one month after notice (was: year-end only). Source

  • GridCreditsTerms changed

    Joulo art. 10.3: immediate termination at the latest one month after notice (was: year-end only). Source

  • JouloTerms changed

    No passed-on brand fee anymore (was: allowed, art. 5.13). Immediate termination at the latest one month after notice (was: year-end only). Source

  • TibberTerms changed

    Joulo: no passed-on brand fee anymore (was: allowed). Immediate termination at the latest one month after notice (was: year-end only). Source

  • Alva ChargingMethodology

    Note: sign-up and payout run via ERE-registratie B.V. (active since 2021). Age stays yes, backing no. Source

  • DIC LaadsystemenOur correction

    Founding date corrected to 12 June 2020 (was: January 2003). The customer mandates Targray. Age stays yes. Source

  • ERE DCMethodology

    Age becomes no: ERE-DC B.V. registered on 20 May 2026, Duurzame Cijfers B.V. on 17 December 2025 (was: unknown). Source

  • EV-Optimizer ERE-collectiefMethodology

    Age via the weakest link: Zeres B.V. holds the contract and payout, incorporated 24 December 2025 (was: yes). Source

  • FluctisMethodology

    Note: the mandate goes to Targray Europe B.V. (1998). Age stays yes, backing stays no. Source

  • Frank EnergieMethodology

    Contract, mandate and payout run via Joulo B.V. (30 March 2026). Age and backing become no (was: yes). Source

  • Frank EnergieTerms changed

    Payout without an approval step: the knowledge base and blog now say the amount goes straight to your IBAN after a message. Trust check ‘paid automatically’ becomes Yes. Source

  • Frank EnergieTerms changed

    Joulo's terms (art. 5.7, 5.13 and 10.5) now protect kWh measured earlier against a later increase or pass-on, also after cancelling. Source

  • GridCreditsMethodology

    Note: the mandate goes directly to Joulo B.V. (30 March 2026). Age and backing stay no. Source

  • GridCreditsTerms changed

    The FAQ no longer gives a term for the first payout; the related con was removed (was: 4 to 6 months after sign-up). Source

  • Groen-laden.nlTerms changed

    Terms art. 15.1: now 1 year (2026 or 2027) or 2 years (2026+2027), like the prices on the site (was: one, three or five calendar years). Source

  • Hey! ChargingMethodology

    Note: on the Last Mile Solutions route the customer mandates Targray Europe B.V. (1998). Age stays yes, backing no. Source

  • Inboekdienst.nlMethodology

    Sign-up mandates Zeres B.V. (incorporated 24 December 2025) to book. Age becomes no (was: yes). Source

  • JouloOur correction

    Founding date corrected to 30 March 2026 (was: 12 December 2025). Terms: last update 6 October 2026. Source

  • JouloTerms changed

    Payout without an approval step: the knowledge base and blog now say the amount goes straight to your IBAN after a message. Trust check ‘paid automatically’ becomes Yes. Source

  • JouloTerms changed

    Terms art. 5.7, 5.13 and 10.5: a higher service fee or a passed-on brand fee only applies to kWh from 1 January; kWh measured earlier keep the old fee, also after cancelling. Source

  • LaadCashTerms changed

    Visiting address Wethouder Beverstraat 130, Enschede, phone 06 30 73 51 57. Terms 1.1 (was: 1.0). KvK 20 September 2024 (was: unknown). Source

  • LaadCashTerms changed

    Terms version 1.1: the 9.5% commission stays for as long as you remain a customer (first 200 participants, 13% after that); earlier participants move to 9.5% too. The yearly commission decrease is dropped. Source

  • LaadloonTerms changed

    ‘Direct’ payout now follows once the sale is received, with no fixed date (was: Q3 of the same year). Default stays Q1 of the next year. Source

  • LaadloonTerms changed

    The site now says the 20% commission includes VAT; the terms (art. 5.3) still say excl. VAT where due. Source

  • LaadnetTerms changed

    Now also for business: 15% up to 25,000 kWh per connection, lower for large sites, plus €180 verification a year (was: private only). Source

  • LekkerladenOur correction

    Age corrected: KvK registration 30 December 2025. Achmea provides funding and is not a registered owner (was: yes via Achmea). Source

  • LekkerladenTerms changed

    Volume discount published: from 3,500 kWh a year lower service fees, down to 14% (1 year) and 10% (3 years); standard 25%, 22% or 18%. Source

  • LekkerladenOur correction

    Con corrected: the term is 1, 2 or 3 calendar years, as in art. 16 of the terms (was: 1, 3 or 5). Source

  • Tap Green CreditsMethodology

    Age via the weakest link: Inboekers B.V. was registered on 24 December 2025. Active since 2023 becomes no (was: yes). Source

  • TibberMethodology

    Contract, mandate and payout run via Joulo B.V. (30 March 2026). Age and backing become no (was: yes). Source

  • TibberTerms changed

    Payout without an approval step: the knowledge base and blog now say the amount goes straight to your IBAN after a message. Trust check ‘paid automatically’ becomes Yes. Source

  • TibberTerms changed

    Joulo's terms (art. 5.7, 5.13 and 10.5) now protect kWh measured earlier against a later increase or pass-on, also after cancelling. Source

  • ZeresTerms changed

    Business audit: €150 per EAN a year up to 75,000 kWh, €1,700 above that; on site €1,900 extra (was: €150; on site €750 plus the auditor). Source

  • ZeresTerms changed

    €0.13 per kWh is now on the site as the payout for Q1 to Q3 2026, not as a guarantee; con removed (was: ‘guaranteed minimum’). Source

  • ZonneplanMethodology

    The mandate and the bill credit stay with Zonneplan Energie. Lekkerladen only shares the 20% fee. Age and backing stay yes. Source

  • DIC LaadsystemenAdded

    Added to the comparison. Source

  • Hey! ChargingAdded

    Added to the comparison. Source

  • LaadCashTerms changed

    Commission lowered from 17% to a fixed 9.5% for the first 200 participants (13% after that); art. 4 of the terms now says ‘standard 9.5%’, under the same version label 1.0 of 22 September 2026. Source

  • LaadCashStatus

    Status changed to pre-registration: per its own site LaadCash may only register with the NEa once it represents 200 participants (Regeling energie vervoer art. 9: 200 mandates or 2 million kWh a year). Source

  • LaadCashTerms changed

    The two cost items are now listed directly under the calculator; the check ‘Any extra costs are shown right next to the price’ becomes Yes. Source

September 2026

  • JouloTerms changed

    Business verification becomes €48 (up to 20,000 kWh) or €180 (20,000 to 75,000 kWh) per connection per year excl. VAT, deducted from the payout, from 31 October 2026 (art. 5.4). HOA: one-off €150. Source

  • Alva ChargingAdded

    Added to the comparison. Source

  • CAPAXX EnergyAdded

    Added to the comparison. Source

  • ChargitAdded

    Added to the comparison. Source

  • Energieluitjes.nlAdded

    Added to the comparison. Source

  • ERE DCAdded

    Added to the comparison. Source

  • EreDirectAdded

    Added to the comparison. Source

  • EV-Optimizer ERE-collectiefAdded

    Added to the comparison. Source

  • Even LadenAdded

    Added to the comparison. Source

  • FluctisAdded

    Added to the comparison. Source

  • LaadVerdienAdded

    Added to the comparison. Source

  • MobiliticsAdded

    Added to the comparison. Source

  • PowerFlowAdded

    Added to the comparison. Source

  • Renewable Energy SolutionsAdded

    Added to the comparison. Source

  • Frank EnergieTerms changed

    The terms of Joulo (which registers for Frank Energie) now give the right to cancel free of charge before any adverse change takes effect (art. 11.2); the price-change check becomes Yes. Source

  • JouloTerms changed

    Terms changed: a service fee increase only applies from 1 January and you can cancel free of charge before any adverse change (art. 5.7, 11.2), so the price-change check becomes Yes. Art. 5.13 now only covers a charger maker’s brand fee. Art. 10.2 was reworded; the calendar-year term is unchanged. Source

  • TibberTerms changed

    The terms of Joulo (which registers for Tibber) now give the right to cancel free of charge before any adverse change takes effect (art. 11.2); the price-change check becomes Yes. Source

  • LaadBalansOur correction

    Lock-in clarified: the 1-year contract cannot be cancelled early either, not only the multi-year ones (terms art. 12.2). Source

  • LaadnetOur correction

    Term corrected: minimum 12 months, then until 31 December of that year, renewing per calendar year (was: 24 months). Source

  • 0-CO2Status

    Offer appears discontinued; 0-co2.nl redirects to Groen-laden. Source

  • 50fiveOur correction

    Commission corrected: 23% (1 year), 21% (2 years) or 19% (3 years) (was: not public). Source

  • 50fiveOur correction

    Costs added: 50five subscription required (from €4.00 a month); €75 per remaining year on early exit. Source

  • 50fiveOur correction

    Payout corrected: the aim is by May of the following year; self-billing applies to business only. Source

  • 50fiveOur correction

    Term corrected: 12 months, no lock-in (was: unknown). Source

  • Den Hartog ChargingOur correction

    Commission corrected: 25% (1 year), 20% (3 years) or 15% (5 years) of net proceeds (was: unknown). Source

  • Den Hartog ChargingOur correction

    Payout corrected: after sale, within 30 days per the terms; the FAQ says monthly (was: unknown). Source

  • Den Hartog ChargingOur correction

    Term corrected: 12 months, no lock-in, renewed tacitly each year (was: unknown). Source

  • EarnergyOur correction

    Commission corrected: 20%, 2 points lower per referral down to 5% (was: unknown). Source

  • EarnergyOur correction

    Payout corrected: quarterly (was: after verification). Source

  • EarnergyOur correction

    Audience extended: business and VvE too (was: private only). Source

  • Eneco eMobilityAdded

    Added to the comparison. Source

  • ERE-registratieOur correction

    Commission corrected: 27.5% (1 year), 25% (3 years) or 22.5% (5 years), incl. VAT (was: unknown). Source

  • ERE-registratieOur correction

    Payout corrected: quarterly with automatic readout, annually with manual upload (was: unknown). Source

  • ERE-registratieOur correction

    Term corrected: 12 months, no lock-in (was: unknown). Source

  • EssentAdded

    Added to the comparison. Source

  • Frank EnergieAdded

    Added to the comparison. Source

  • GridCreditsOur correction

    Term detailed: 12 months; Joulo mandate per calendar year, cancel before 30 November (was: unknown). Source

  • GridCreditsOur correction

    Costs added: possible CPO or manufacturer data costs and pre-agreed extra NEa work. Source

  • GridCreditsOur correction

    Commission detailed: business 15% excl. VAT. Source

  • Groen-laden.nlOur correction

    Payout detailed: once a year after the calendar year ends; the fixed fee is netted against it. Source

  • Groen-laden.nlOur correction

    Costs added: no extra costs for consumers (fee incl. VAT); business pays 10% plus a one-off €150 audit. Source

  • Inboekdienst.nlOur correction

    Commission corrected: 15% standard per terms art. 5.10; 12% only with a partner code (was: 12%). Source

  • Inboekdienst.nlOur correction

    Term corrected: 1 calendar year, renewed tacitly each year, no lock-in (was: 24 months with lock-in). Source

  • Inboekdienst.nlOur correction

    Payout corrected: quarterly (was: unknown). Source

  • Inboekdienst.nlOur correction

    Offer detailed: processed by partner Zeres; the contracting party is Joulers B.V. Source

  • JouloOur correction

    Payout detailed: quarterly, within 30 days after the quarter; you approve each payout in the dashboard. Source

  • JouloOur correction

    Commission detailed: 20% incl. VAT in year 1, then 1 point lower a year to 17%; referrals take it to 10%. Source

  • JouloOur correction

    Costs added: charger brands' data-access fees can be passed on (art. 5.13). Source

  • LaadBalansTerms changed

    Holdback of up to 25% removed: the September 2026 terms contain no reserve clause. Source

  • LaadBalansTerms changed

    Legal entity updated to Laadbalans B.V., per the September 2026 terms (was: Tchoice B.V.). Source

  • LaadBalansOur correction

    Payout corrected: annually per terms art. 5.6; the site still says quarterly (was: varies). Source

  • LaadBalansOur correction

    Commission detailed: on net proceeds; business from 11% at volume. Source

  • LaadbeloningOur correction

    Audit fee added: €9.99, €4.99 or €0 per charge point per year (excl. VAT), deducted from the payout. Source

  • LaadbeloningOur correction

    Commission detailed: 15% (1 year), 11% (2 years) or 10% (3 years), excl. VAT. Source

  • LaadbeloningOur correction

    Audience corrected: private and business (was: also VvE, which is not offered). Source

  • LaadCashTerms changed

    Terms v1.0 (22-09-2026): Laadcash bears its own advertising and acquisition costs; we removed that cost share. Source

  • LaadCashOur correction

    Payout corrected: annually; booked after year-end (until end of February), then sold (was: after sale). Source

  • LaadCashOur correction

    Commission detailed: calculated on proceeds after transaction and verification costs. Source

  • LaadkompasOur correction

    Commission corrected: 15% with free charge management, 10% with paid, 25% for manual upload (was: on request). Source

  • LaadkompasOur correction

    Promotion added: 0% commission in 2026 with charge management. Source

  • LaadkompasOur correction

    Payout corrected: at least yearly; 2026 EREs booked by 1 March 2027, then paid after sale (was: unknown). Source

  • LaadkompasOur correction

    Term corrected: 12 months, no lock-in (was: unknown). Source

  • LaadloonOur correction

    Commission corrected: 20% in 2026, excl. VAT where applicable; reviewed in 2027 (was: unknown). Source

  • LaadloonOur correction

    Payout corrected: annually, normally in Q1 of the following year (was: after sale). Source

  • LaadloonOur correction

    Payout detailed: the FAQ also offers an earlier payout in Q3 ('Direct'). Source

  • LaadnetOur correction

    Term corrected: at least 12 months, then until 31 December; bound for up to about 2 years (was: 12 months). Source

  • LaadnetOur correction

    Costs added: audit and verification costs from non-conformity can be passed on (art. 7.3.2). Source

  • LaadnetOur correction

    Payout detailed: the terms give no fixed payout date (art. 13.5.1). Source

  • LaadpremieOur correction

    Payout corrected: annually, within 6 months after the year; quarterly is only an aim (was: quarterly). Source

  • LaadpremieOur correction

    Term corrected: at least until the end of the next calendar year, up to 24 months (was: 12 months, no lock-in). Source

  • LekkerladenOur correction

    Payout corrected: quarterly or annually, your choice, each after the sale (was: after sale). Source

  • LekkerladenOur correction

    Commission detailed: 25% (1 year), 22% (2 years) or 18% (3 years), incl. VAT. Source

  • PowerDOur correction

    Commission detailed: 25% gross; per the terms variable and adjustable yearly (art. 11.7 to 11.8). Source

  • PowerDOur correction

    Payout corrected: no fixed timeframe; paid once the proceeds are in. Source

  • PowerDOur correction

    Costs added: no fixed fees, but the terms allow extra charges (art. 14.4). Source

  • StekkerOur correction

    Payout corrected: annually in Q1 of the following year, first in Q1 2027 (was: quarterly). Source

  • StekkerOur correction

    Commission detailed: 15% for ERE only, 25% with smart charging; credits lower it to 10%. Source

  • StekkerOur correction

    Audience extended: VvEs too (they sign up as a business customer). Source

  • Tap Green CreditsOur correction

    Commission corrected: 24% (1 year), 22% (2 years) or 20% (3 years) by term (was: 24% in year 1, then 20%). Source

  • Tap Green CreditsOur correction

    Payout detailed: annually after the audit, first on 31 March 2027. Source

  • Tap Green CreditsOur correction

    Offer detailed: processed by partner Inboekers.nl; only with a Tap back office, app or charge card. Source

  • TibberAdded

    Added to the comparison. Source

  • VattenfallOur correction

    Costs added: required charging subscription of €6.95 a month plus a Vattenfall electricity contract. Source

  • VattenfallOur correction

    Payout corrected: in Q2 of the following year, by 30 June; first offset against open invoices. Source

  • VattenfallOur correction

    Term detailed: until 31 December of the sign-up year (art. 8a). Source

  • VattenfallOur correction

    Condition detailed: only with an Autel MaxiCharger with a MID meter. Source

  • VolticoOur correction

    Payout detailed: in February, May, August and November, first in autumn 2026; nothing below 50 kWh a year. Source

  • VolticoOur correction

    Commission detailed: 20%; the binding rate is in a tariff sheet that is not public. Source

  • VolticoOur correction

    Audience extended: business and VvE too (was: private only). Source

  • XolvereOur correction

    Commission corrected: 20%, 1 point lower a year to 16% from year 5 (was: 18%, a partner deal). Source

  • XolvereOur correction

    Payout corrected: quarterly, first around March 2027 (was: annually). Source

  • ZeresOur correction

    Commission corrected: private 19% incl. VAT, 1 point lower per renewal year to 14% (was: unknown). Source

  • ZeresOur correction

    Payout corrected: quarterly, within 30 days after acceptance, sale and receipt (was: after sale). Source

  • ZeresOur correction

    Costs added: transaction, verification, audit and admin costs are deducted before the commission. Source

  • ZeresOur correction

    No guaranteed price listed: terms art. 4.2 guarantee no revenue, unlike the €0.13/kWh on the homepage. Source

  • ZonneplanAdded

    Added to the comparison. Source

How we compare