Transparency
Changes at ERE providers
Every month we automatically check the terms, prices and privacy policies of every provider. When something changes, or when we correct a data point ourselves, it appears here with a date and source.
141 changes at 44 providers
- Terms changed 30
- Our correction 75
- Methodology 12
- Status 4
- Added 20

October 2026

Groen-laden.nlTerms changedNew agreements: 15% of gross ERE proceeds, at least €34.99 and at most €79.99 per charger per calendar year, incl. VAT (was: a fixed fee of €79.99 a year). No fixed fee per kWh. The homepage says the charger is read automatically. Source
- LaadCashStatus
Sign-up is open and terms version 1.1 (since 6 October 2026) are public; LaadCash registers with the NEa once it has 200 participants and its own REV account is open. The label becomes ‘Sign-up open · registration from 200 participants’ instead of ‘Pre-registration’. Score unchanged (8.0). Source
- LekkerladenMethodology
Commission at the reference volume (4,000 kWh) now uses the published volume tier: 22% instead of the standard rate of 25%. Source
Frank EnergieTerms changedJoulo: no passed-on brand fee anymore (was: allowed). Immediate termination at the latest one month after notice (was: year-end only). Source
GridCreditsTerms changedJoulo art. 10.3: immediate termination at the latest one month after notice (was: year-end only). Source

Alva ChargingMethodologyNote: sign-up and payout run via ERE-registratie B.V. (active since 2021). Age stays yes, backing no. Source
DIC LaadsystemenOur correctionFounding date corrected to 12 June 2020 (was: January 2003). The customer mandates Targray. Age stays yes. Source
EV-Optimizer ERE-collectiefMethodologyAge via the weakest link: Zeres B.V. holds the contract and payout, incorporated 24 December 2025 (was: yes). Source

Frank EnergieMethodologyContract, mandate and payout run via Joulo B.V. (30 March 2026). Age and backing become no (was: yes). Source
Frank EnergieTerms changedPayout without an approval step: the knowledge base and blog now say the amount goes straight to your IBAN after a message. Trust check ‘paid automatically’ becomes Yes. Source
Frank EnergieTerms changedJoulo's terms (art. 5.7, 5.13 and 10.5) now protect kWh measured earlier against a later increase or pass-on, also after cancelling. Source
GridCreditsMethodologyNote: the mandate goes directly to Joulo B.V. (30 March 2026). Age and backing stay no. Source
GridCreditsTerms changedThe FAQ no longer gives a term for the first payout; the related con was removed (was: 4 to 6 months after sign-up). Source
Groen-laden.nlTerms changedTerms art. 15.1: now 1 year (2026 or 2027) or 2 years (2026+2027), like the prices on the site (was: one, three or five calendar years). Source
Hey! ChargingMethodologyNote: on the Last Mile Solutions route the customer mandates Targray Europe B.V. (1998). Age stays yes, backing no. Source
- Inboekdienst.nlMethodology
Sign-up mandates Zeres B.V. (incorporated 24 December 2025) to book. Age becomes no (was: yes). Source


- LekkerladenOur correction
Age corrected: KvK registration 30 December 2025. Achmea provides funding and is not a registered owner (was: yes via Achmea). Source
- LekkerladenTerms changed
Volume discount published: from 3,500 kWh a year lower service fees, down to 14% (1 year) and 10% (3 years); standard 25%, 22% or 18%. Source
- LekkerladenOur correction
Con corrected: the term is 1, 2 or 3 calendar years, as in art. 16 of the terms (was: 1, 3 or 5). Source
Tap Green CreditsMethodologyAge via the weakest link: Inboekers B.V. was registered on 24 December 2025. Active since 2023 becomes no (was: yes). Source






DIC LaadsystemenAddedAdded to the comparison. Source
Hey! ChargingAddedAdded to the comparison. Source
September 2026
Alva ChargingAddedAdded to the comparison. Source
- CAPAXX EnergyAdded
Added to the comparison. Source
- Energieluitjes.nlAdded
Added to the comparison. Source

Added to the comparison. Source
- Even LadenAdded
Added to the comparison. Source

- LaadVerdienAdded
Added to the comparison. Source
MobiliticsAddedAdded to the comparison. Source

Added to the comparison. Source
Frank EnergieTerms changedThe terms of Joulo (which registers for Frank Energie) now give the right to cancel free of charge before any adverse change takes effect (art. 11.2); the price-change check becomes Yes. Source
- JouloTerms changed
Terms changed: a service fee increase only applies from 1 January and you can cancel free of charge before any adverse change (art. 5.7, 11.2), so the price-change check becomes Yes. Art. 5.13 now only covers a charger maker’s brand fee. Art. 10.2 was reworded; the calendar-year term is unchanged. Source

LaadBalansOur correctionLock-in clarified: the 1-year contract cannot be cancelled early either, not only the multi-year ones (terms art. 12.2). Source
- Den Hartog ChargingOur correction
Commission corrected: 25% (1 year), 20% (3 years) or 15% (5 years) of net proceeds (was: unknown). Source
- Den Hartog ChargingOur correction
Payout corrected: after sale, within 30 days per the terms; the FAQ says monthly (was: unknown). Source
- Den Hartog ChargingOur correction
Term corrected: 12 months, no lock-in, renewed tacitly each year (was: unknown). Source



Eneco eMobilityAddedAdded to the comparison. Source
ERE-registratieOur correctionCommission corrected: 27.5% (1 year), 25% (3 years) or 22.5% (5 years), incl. VAT (was: unknown). Source
ERE-registratieOur correctionPayout corrected: quarterly with automatic readout, annually with manual upload (was: unknown). Source
ERE-registratieOur correctionTerm corrected: 12 months, no lock-in (was: unknown). Source

Frank EnergieAddedAdded to the comparison. Source
GridCreditsOur correctionTerm detailed: 12 months; Joulo mandate per calendar year, cancel before 30 November (was: unknown). Source
GridCreditsOur correctionCosts added: possible CPO or manufacturer data costs and pre-agreed extra NEa work. Source
GridCreditsOur correctionCommission detailed: business 15% excl. VAT. Source
Groen-laden.nlOur correctionPayout detailed: once a year after the calendar year ends; the fixed fee is netted against it. Source
Groen-laden.nlOur correctionCosts added: no extra costs for consumers (fee incl. VAT); business pays 10% plus a one-off €150 audit. Source
- Inboekdienst.nlOur correction
Commission corrected: 15% standard per terms art. 5.10; 12% only with a partner code (was: 12%). Source
- Inboekdienst.nlOur correction
Term corrected: 1 calendar year, renewed tacitly each year, no lock-in (was: 24 months with lock-in). Source
- Inboekdienst.nlOur correction
Payout corrected: quarterly (was: unknown). Source
- Inboekdienst.nlOur correction
Offer detailed: processed by partner Zeres; the contracting party is Joulers B.V. Source
LaadBalansTerms changedHoldback of up to 25% removed: the September 2026 terms contain no reserve clause. Source
LaadBalansTerms changedLegal entity updated to Laadbalans B.V., per the September 2026 terms (was: Tchoice B.V.). Source
LaadBalansOur correctionPayout corrected: annually per terms art. 5.6; the site still says quarterly (was: varies). Source
LaadBalansOur correctionCommission detailed: on net proceeds; business from 11% at volume. Source
LaadbeloningOur correctionAudit fee added: €9.99, €4.99 or €0 per charge point per year (excl. VAT), deducted from the payout. Source
LaadbeloningOur correctionCommission detailed: 15% (1 year), 11% (2 years) or 10% (3 years), excl. VAT. Source
LaadbeloningOur correctionAudience corrected: private and business (was: also VvE, which is not offered). Source
- LaadkompasOur correction
Commission corrected: 15% with free charge management, 10% with paid, 25% for manual upload (was: on request). Source
- LaadkompasOur correction
Promotion added: 0% commission in 2026 with charge management. Source
- LaadkompasOur correction
Payout corrected: at least yearly; 2026 EREs booked by 1 March 2027, then paid after sale (was: unknown). Source
- LaadkompasOur correction
Term corrected: 12 months, no lock-in (was: unknown). Source



- LaadpremieOur correction
Payout corrected: annually, within 6 months after the year; quarterly is only an aim (was: quarterly). Source
- LaadpremieOur correction
Term corrected: at least until the end of the next calendar year, up to 24 months (was: 12 months, no lock-in). Source
- LekkerladenOur correction
Payout corrected: quarterly or annually, your choice, each after the sale (was: after sale). Source
- LekkerladenOur correction
Commission detailed: 25% (1 year), 22% (2 years) or 18% (3 years), incl. VAT. Source






Tap Green CreditsOur correctionCommission corrected: 24% (1 year), 22% (2 years) or 20% (3 years) by term (was: 24% in year 1, then 20%). Source
Tap Green CreditsOur correctionPayout detailed: annually after the audit, first on 31 March 2027. Source
Tap Green CreditsOur correctionOffer detailed: processed by partner Inboekers.nl; only with a Tap back office, app or charge card. Source

- VattenfallOur correction
Costs added: required charging subscription of €6.95 a month plus a Vattenfall electricity contract. Source
- VattenfallOur correction
Payout corrected: in Q2 of the following year, by 30 June; first offset against open invoices. Source
- VattenfallOur correction
Term detailed: until 31 December of the sign-up year (art. 8a). Source
- VattenfallOur correction
Condition detailed: only with an Autel MaxiCharger with a MID meter. Source




