| Alva Charging | The linked contract is the ERE-registratie PDF: minimum one calendar year, then tacitly one more year. Consumers after the first period: indefinite, with one month. Marketing packs of 3 or 5 years were not re-checked on the Alva page in this pass. | Yes | Calculated from the notice periodNovember 19, 2026Calculated from the notice period: 6 weeks (19 November 2026) during the first period, the same as ERE-registratie. | Not named in art. 13. | No fee stated. | Not found in the public terms (not in art. 13). | Partial |
|---|
| ERE-registratie | Minimum one calendar year, then tacitly another calendar year. After the first period a consumer contract becomes indefinite. | Yes | Calculated from the notice periodNovember 19, 2026Calculated from the notice period: 6 weeks (19 November 2026) for an end on 31 December 2026, only at year-end during the fixed period. After the first period: one month. | Not named in art. 13. | No fee stated. | Not found in the public terms (not in the art. 13 extract). | Partial |
|---|
| EV-Optimizer ERE-collectief | One calendar year. Zeres B.V. is named as the registration provider. It ends on 31 December unless you confirm the next year. | No | Calculated from the notice periodNovember 30, 2026Calculated from the notice period: one calendar month before year-end (30 November 2026). Doing nothing also ends the contract on 31 December. | info@zeres.nl or the dashboard. | No fee stated. | Art. 11.7: finished through the payout for the quarter in which the contract ends. Later EREs are not booked. | Checked |
|---|
| GridCredits | Two contracts. GridCredits: indefinite, no minimum. Joulo booking: a full calendar year. Joulo's own terms say the mandate is not tacit. | No | Date in the termsNovember 30, 2026Date in the terms: to stop the Joulo booking at year-end, received by 30 November. GridCredits itself: anytime, no notice. | info@gridcredits.nl or by phone. GridCredits then starts the Joulo cancellation. | No fee ("geen opzegvergoeding"). | "Wat tot de einddatum is ingeboekt, wordt gewoon met u afgerekend bij de eerstvolgende kwartaalafrekening." | Checked |
|---|
| Inboekdienst.nl | Terms art. 6.1: one calendar year, then tacitly another calendar year. Homepage: "een looptijd van twee (2) kalenderjaren en er is een opzegtermijn van een maand." | Yes | Calculated from the notice periodNovember 30, 2026Calculated from the notice period: 1 month, from terms art. 6.3 (30 November 2026), at the end of the minimum one-year period, in writing. The homepage's two-year term would still cover 2027.The terms (art. 6.1) say one calendar year and then tacitly another year. The homepage says two calendar years and a notice period of one month. Which text binds is not settled. | Email to info@Joulers.nl (art. 6.3). | No separate fee stated. Art. 8.4: the right to payment of EREs already booked or traded lapses on the end date. | Art. 8.4: registration, trading and payout stop. No compensation. Booked NEa data cannot be changed by you. | Checked |
|---|
| LaadCash | Mandate per whole calendar year (1 January to 31 December). Minimum participation one year. The account itself is indefinite. The mandate must be confirmed again for each new year. | No | Calculated from the notice periodNovember 30, 2026Calculated from the notice period: at most one month (30 November 2026). The mandate then ends at year-end. Withdrawing the mandate works only forward. | Account or email is named for the 14-day withdrawal (info@laadcash.nl). The cancellation sentence does not repeat the channel. | No fee stated. Withdrawal during the 14-day period can cost a proportionate share if work has started. | "Reeds geregistreerde ERE van het lopende jaar wordt gewoon afgehandeld en uitbetaald." What is already booked stays booked. Nothing new is booked after withdrawal. | Checked |
|---|
| Laadnet | At least 12 months, then until the end of the calendar year in which that minimum is reached. Then another calendar year if you do not cancel in time. The general terms read on 11 October 2026 are the charging-platform terms. The ERE notice is on the ERE page. | Yes | Calculated from the notice periodNovember 30, 2026Calculated from the notice period: one month before the end of the calendar year (30 November 2026), only if the 12-month minimum has already been reached in 2026. Received in writing. | In writing. The channel is not named on the ERE page. | No fee stated on the ERE page. | Not found in the public terms (not in the ERE-page extract). | Partial |
|---|
| Stekker | One calendar year at a time, continued while the mandate lasts and you have not cancelled. | Yes | Date in the termsNovember 30, 2026Date in the terms: received by 30 November, to switch on 1 January. A cancellation received by 31 December still ends the contract at the end of that year. | In writing. Art. 1.6 counts email and a message in the customer portal as written. | No fee ("kosteloos"). | Art. 9.3: all kWh measured that year are still booked, sold and paid net. | Checked |
|---|
| Voltico | Minimum one calendar year (backdated to 1 January of that year), then indefinite. | Yes | Date in the termsNovember 30, 2026Date in the terms: 30 November, to end on 31 December. "Die opzegging geldt dan voor het volgende kalenderjaar." | Not stated in art. 13. | No fee stated in art. 13. | The mandate runs through 31 December of the year of cancellation. Until then Voltico settles booking and payout of the remaining EREs. | Checked |
|---|
| Zeres | One calendar year. It ends on 31 December unless you confirm a proposal for the next year. | No | Calculated from the notice periodNovember 30, 2026Calculated from the notice period: one calendar month before year-end (30 November 2026), by email or portal, if you do not want 2027. Doing nothing also ends it on 31 December. | info@zeres.nl or the portal. | No fee stated. | Art. 11.7: work is finished through the payout for the quarter in which the contract ends. EREs that would have arisen after the end date are not booked. | Checked |
|---|
| Laadbeloning | Minimum one calendar year, then a successive period. | Yes | Calculated from the notice periodDecember 1, 2026Calculated from the notice period: 1 month. Received by 1 December 2026 if the contract must have ended by 1 January 2027. The clause does not say the end date is 31 December. | In writing, only after Laadbeloning confirms. info@laadbeloning.nl. | No fee stated. | Art. 10: the payout remains due for consumption already definitively booked. Consumption supplied before the end date is still to be processed. The sentence continues past the extract. | Checked |
|---|
| Laadloon | Mandate: one full calendar year, then tacitly renewed by one year. Consumers: first contract period of one year. | Yes | Calculated from the notice periodDecember 1, 2026Calculated from the notice period: 1 month. Consumers may cancel during the first year with one month's notice. By 1 December 2026 if the end date must fall on 1 January 2027. The clause does not fix the end on 31 December. | Not named in art. 9. | No fee stated. Prepaid amounts are refunded pro rata. | Art. 9.3: the payout remains due for consumption already booked. Data supplied before the end date are still booked unless you decline. | Checked |
|---|
| Fluctis | One full calendar year from the execution date, then tacitly each year unless you give written notice of non-renewal before the new compliance year. | Yes | Date in the termsDecember 31, 2026Date in the terms: written notice of non-renewal before 1 January 2027. After year 1, a consumer may also cancel anytime with one month. Calculated from the notice period: that one-month notice falls at about 30 November 2026 if the end date has to fall on 31 December 2026. The page warns that a mid-year cancellation blocks signing with another provider for the rest of the year. | Email to support@fluctis.energy. | No fee stated. | Mandate art. 5: "recht op betaling voor reeds geregistreerde ERE's." Volumes submitted before the end date but not yet registered are still processed, unless you or Last Mile Solutions waive that in writing. | Checked |
|---|
| Frank Energie | The news page says the offer is with Joulo. It does not state a term. Joulo's terms are the terms URL used for this offer. | No | Date in the termsDecember 31, 2026Not stated on Frank's news page. If Joulo's terms are the contract: date in Joulo art. 10, received by 31 December. | Not stated on Frank's news page. See Joulo if those terms are the contract. | Not stated on Frank's news page. | Not stated on Frank's news page. See Joulo if those terms are the contract. | Partial |
|---|
| Hey! Charging | The same mandate structure as Fluctis: one full calendar year, then yearly tacit renewal unless you give written notice of non-renewal before the new year. Consumers after year 1: one month. | Yes | Date in the termsDecember 31, 2026Same as Fluctis: written notice of non-renewal before 1 January 2027. The page: "Na het 1e jaar is het contract op ieder moment op te zeggen met een opzegtermijn van 1 maand." Calculated from the notice period: that month falls at about 30 November 2026 if the end date has to fall on 31 December 2026. | Email to sales@heycharging.com. | No fee stated. | The same sentence in this provider's own PDF: right to payment for EREs already registered. Volumes submitted before the end date are still processed. | Checked |
|---|
| Joulo | Mandate for a stated number of calendar years. Several years are allowed so you need not sign again each year. The contract lasts as long as the mandate. | No | Date in the termsDecember 31, 2026Date in the terms: received by 31 December ends the contract at year-end and allows a switch on 1 January. Direct termination is a different choice and ends within one month. | "Op elk moment". The channel is not named in art. 10.3. | No fee ("kosteloos"). | Year-end exit: Joulo remains the provider for that year and books, sells and pays all kWh measured that year, net (art. 10.5). Direct exit: sessions up to the end date are booked and paid. Later sessions that same year cannot be booked by anyone else for that EAN (art. 10.3 and 10.6). | Checked |
|---|
| Tibber | The ERE contract is Joulo's. Tibber's energy contract is separate and monthly. | No | Date in the termsDecember 31, 2026Date in Joulo's terms: received by 31 December for a switch on 1 January. Tibber: "overstappen kan, maar geldt pas vanaf het volgende kalenderjaar." | "Dat regel je rechtstreeks bij Joulo." | Joulo: no fee. | Joulo art. 10. Leaving Tibber as energy supplier does not stop the ERE registration. The commission goes back to Joulo's standard rate instead of the 10% Tibber rate. | Checked |
|---|
| 50five | Choice of 1, 2 or 3 calendar years. A 1-year sign-up in 2026 runs from 1 January 2026 through 31 December 2026. A 2-year sign-up on 1 April 2026 runs through 31 December 2027. Art. 6.2: the mandate ends by operation of law when the chosen initial term ends. | No | No single date1-year term: no cancellation, it ends on 31 December 2026. 2- or 3-year term: still covers 2027. Cancellation of a later year needs one calendar month's written notice and does not affect the year already running. | Letter or email (art. 7.1). | € 75 per remaining vergoedingsjaar of the initial term if you end a 2- or 3-year term early (art. 7.2). A 1-year term has no mid-year cancellation right. | Art. 5.4: the fee is paid for a full vergoedingsjaar or for the part of the year in which the contract was entered. Art. 7.3: no switch to another provider during a vergoedingsjaar for the same EAN. | Checked |
|---|
| CAPAXX Energy | Not found in the public terms for the registration service. The terms, version 1.0, March 2026, are general assignment terms, not an ERE mandate. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Chargit | No ERE duration. The general terms govern the Chargit agreement. Charger services: either party may cancel after the first 24 months with at least 3 months (art. 4.4). A consumer may, where legally possible, cancel after the first 12 months with 1 month (art. 4.6). | Not stated | No single dateNot found in the public terms for the ERE registration. The consumer right in art. 4.6 (one month after 12 months) does not say the ERE mandate ends on 31 December 2026. | Email to info@chargit.nl with name, address, postcode, place and the desired end date (art. 4.7). That is in the general terms, not as an ERE date. | No ERE exit fee stated. | Not found in the public terms. Art. 6.8: any "groenwaarde" belongs to Chargit and is not payable unless agreed otherwise. | Partial |
|---|
| Den Hartog Charging | Not found in the public terms. The portal is empty. The product page has no cancellation clause. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| DIC Laadsystemen | Mandate art. 5: one full calendar year, then tacit yearly renewal. A consumer may cancel after year 1 with one month. The programme page does not split consumer and business and says three months. | Yes | No single dateThe notice periods differ. Mandate: non-renewal before the new year, or one month after year 1. Page: "Na het 1e jaar is het contract op ieder moment op te zeggen met een opzegtermijn van 3 maanden."The mandate says one month for consumers after year 1, or non-renewal before the new year. The programme page says three months and does not split consumer and business. Which period applies is not settled. | Page: email to info@diclaadsystemen.nl. | No fee stated in the mandate extract. | The same payout sentence as Fluctis and Hey, in this PDF: right to payment for EREs already registered. Volumes submitted before the end date are still processed. | Checked |
|---|
| Earnergy | Not found in the public terms. The PDF returned no readable text. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Eneco eMobility | Not found in the public terms. Pre-registration. The page states no term or notice. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Energieluitjes.nl | Web terms art. 10: minimum one calendar year, then tacitly one calendar year. Mandate art. 8: at least one full calendar year, 1 January to 31 December, and it can be extended per calendar year. | Yes | No single dateThe two texts give different dates. Calculated from the web terms: 6 weeks (19 November 2026), only at year-end. The mandate: anytime with 1 month, and a cancellation received by 30 November stops tacit renewal for the next year.The web terms say only at year-end, with 6 weeks. The mandate says anytime with 1 month, and 30 November as the cut-off for tacit renewal. Which document would be preferred is not settled. | Not named. | No fee stated. | Mandate art. 8: after cancellation Energieluitjes remains the provider for the registered EAN for the current year, and all kWh measured that year are booked, sold and paid net. | Checked |
|---|
| ERE DC | Homepage: 1, 3 or 5 calendar years. The 1-year option is labelled "Flexibel, jaarlijks opzegbaar." General terms: every contract is for an indefinite period unless the assignment itself is for a fixed period. | Not stated | No single dateNot a single rule. The general terms allow either party to cancel immediately in writing. The homepage does not give a date.The homepage says 1, 3 or 5 calendar years. The general terms say an indefinite period, unless the assignment itself is fixed, and immediate written cancellation. Which text would be preferred is not settled. | In writing, under the general terms. | General terms: if the work is unfinished, the fee for work already done and costs incurred must be paid. No separate ERE penalty was found. | Not found in the public terms. | Partial |
|---|
| EreDirect | Pre-registration. The published mandate is a commitment for the whole calendar year 2026. Mandates run from 1 January to 31 December. Without a new mandate the service ends on 31 December. | No | No cancellation neededNo notice date is required to avoid renewal. Do not sign a new mandate. No mid-year cancellation. A 2026 mandate runs through 31 December 2026. 2027 requires a new mandate. | Do not sign a new mandate. | No fee stated in the captured clause. | Not found in the public terms what happens to the payout after the end. The 2026 commitment is exclusive for kWh loaded in 2026. | Partial |
|---|
| Even Laden | Not found in the public terms. The service annex describes the service and says it belongs to the signed mandate, but the extract has no term or notice. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Groen-laden.nl | 1 year (2026 or 2027) or 2 years (2026 and 2027), as named in the individual contract. No tacit renewal. | No | No single dateA 2026-only contract is not renewed, so 2027 needs a new mandate. A 2026 and 2027 contract still covers 2027 unless you cancel after 12 months from signing, with at most one month's notice. Whether that frees 1 January 2027 depends on the sign date. | Email, in writing, via the portal if available, or the same way the contract was made. | "Er geldt geen opzegboete." | Volumes already received, filed, sold, verified or administratively necessary may still be settled. No new work after the end date, except a correct settlement or a legal duty. Cancellation during a year must not cause double booking. | Checked |
|---|
| LaadBalans | 1, 3 or 5 full calendar years, from 1 January through 31 December of the last year. A mid-year sign-up still covers that whole calendar year's charge data, within the legal booking window. The mandate is not tacit. The contract text does not say the contract itself renews automatically. | No | No single dateDuring the mandate you cannot end early, except with Laadbalans's permission. A 1-year contract that runs through 31 December 2026 ends then. A 3- or 5-year contract signed for 2026 still covers 2027. | Not a right of yours during the term, except the 14-day withdrawal for distance contracts. | No fee stated. Early exit is not a right of yours. | If Laadbalans dissolves the contract: "Laadbalans is in deze situatie niet verantwoordelijk voor het inboeken van de geregistreerde Laaddata." No general payout-after-exit clause was in the extract. | Checked |
|---|
| Laadkompas | Not found in the public terms. The page and a Salesforce file returned empty shells, not terms. The Salesforce link is not printed as a URL in the research. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Laadpremie | Mandate until the end of the next calendar year, then tacitly one year at a time. Art. 9.1: the first period runs from the start of the current calendar year until the end of the following calendar year. | Yes | Not possible on 1 January 2027A 2026 start cannot be ended for 1 January 2027. Interim cancellation is excluded during that first period. After it: one month before the end date, or anytime with one month after the first tacit renewal. | Not named in art. 4 or 9. | No cancellation fee stated. Prepaid amounts are refunded pro rata (art. 4.2). | Art. 9.3: the payout remains due for consumption already booked, unless art. 9.2 applies. | Checked |
|---|
| LaadVerdien | Not found in the public terms. The page returned a short shell without the clauses. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Lekkerladen | The homepage offers a choice of 1, 2 or 3 years. Not found in the public terms: the terms URL returned an empty page. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Mobilitics | Minimum 3 calendar years. The clause does not say it renews into a new fixed block. Cancellation is only at a year-end, so it does not end by itself at the first year-end. | Not stated | Not possible on 1 January 2027Not available for 1 January 2027 if the three-year minimum started in 2026. After the minimum: only at the end of a calendar year, with 8 weeks. Calculated from the notice period: about 5 November of the exit year. That is not a date Mobilitics prints. | Not named in art. 13. | No fee stated. | Not found in the public terms (not in art. 13). | Partial |
|---|
| PowerD | By operation of law until 31 December of the calendar year in which the contract was made. No renewal clause. | No | No cancellation neededA contract made in 2026 ends on 31 December 2026 without a cancellation by you. No clause tells you to cancel in order to switch. | The route where you give notice is not stated. PowerD may end the contract immediately in the listed cases (art. 4.2). Consumers have a 14-day withdrawal right (art. 5.1). | No exit fee stated. | Art. 4.3: after the end, no further EREs are booked or traded. Art. 4.4: proceeds already realised but not yet paid are settled. | Checked |
|---|
| PowerFlow | One full calendar year, then extended by one calendar year each time. The contract term is separate from the mandate in art. 9. | Yes | No single dateArt. 12.2a gives private customers a one-month cancellation right only after the first renewal. No notice date is stated for stopping the first renewal itself. A customer still in the first year is not given a 2026 deadline for a switch on 1 January 2027. | Not named in art. 12. | No fee stated. | Art. 12.5: you keep the right to payout of EREs already definitively booked and traded, unless the end was caused by fraud, double counting or knowingly false information. | Checked |
|---|
| Renewable Energy Solutions | Not found in the public terms for the ERE service. The general terms are not an ERE contract. They say the customer cannot end the contract in the interim. | Not found in the public terms. | No single dateNot found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Not found |
|---|
| Tap Green Credits | Product page: 1, 2 or 3 years (commission 24%, 22% or 20%). No notice period on that page. The app terms are the Tap app licence, not an ERE contract. | Not stated | No single dateThe FAQ: move the mandate only after the signed term has ended. A 2026 one-year term can end before 2027. A 2- or 3-year term signed in 2026 still covers 2027. No date is printed. | Not found in the public terms. | Not found in the public terms. | Not found in the public terms. | Partial |
|---|
| Vattenfall | Until 31 December of the calendar year of sign-up (the programme year). The mandate is per calendar year and exclusive per EAN. Service page: "wordt niet automatisch verlengd." | No | No cancellation neededNo notice is required for a 2026 contract to end on 31 December 2026. Do not give a new mandate for 2027. A written cancellation during 2026 has one month's notice and forfeits that year's cashback. | In writing (art. 8). | No fee. Mid-year cancellation forfeits the cashback built up in that programme year. | If the contract simply ends on 31 December, cashback is paid in the second quarter of the next year, after verification (art. 8). If you cancel during the programme year, the right to that year's cashback lapses. Art. 8 also says cancellation ends the mandate ("Bij opzegging eindigt tevens de door u verleende Machtiging"). | Checked |
|---|
| Xolvere | Consumers: one full calendar year, 1 January to 31 December. It ends by operation of law on 31 December. A new mandate needs active confirmation. | No | No cancellation neededNo cancellation needed to be free on 1 January 2027. Do not confirm the new mandate. Xolvere asks in December. During the current year the mandate cannot be moved. | Not required for the year-end end. The FAQ: choose at year-end whether to renew. | No fee stated. | Art. 17.1: no new EREs are booked or traded after the end. Art. 17.2: proceeds already realised but not yet paid are settled. | Checked |
|---|
| Zonneplan | "Eén of meer" full calendar years. The applicable period is shown in the Zonneplan app, not on the public page. If you do not confirm again, it ends by operation of law. | No | No single dateDo not reconfirm if the current period ends on 31 December 2026. If the app period already includes 2027, this page does not show an earlier exit. The exact number of years is only in the app. | In the app: decline the next confirmation. No separate notice period is stated. | Art. 13.5: ending the service gives no right to damages, aside from art. 14. | Art. 13.4: Zonneplan pays the net ERE proceeds realised up to that moment and not yet paid. | Partial |
|---|